ANALYSIS OF SHUTDOWN SCHEDULE AT CRUSHER MASTER PLANT STUDY CASE AT PT FREEPORT INDONESIA
Mill Concentrating Division is one of the operation division within PT Freeport Indonesia that have <br /> <br /> crucial role and significant function on processing rocks until the final result (concentrate). To <br /> <br /> produce a concentrate, rocks will through into va...
Saved in:
Main Author: | ONTORJO 29115290 , EKO |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21907 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPERATIONAL RISK MANAGEMENT AT CRUSHER MASTER PLAN PROJECT PT FREEPORT INDONESIA
by: NUGROHO (NIM : 29107127); Pembimbing: Ir. RUDY BEKTI, MM, SETIA -
THE ANALYSIS OF PROJECT COMPLETION DELAY ALONG WITH THE RECOMMENDATION OF THE SYSTEM AND PROCEDURE TO HANDLE IT AT PT. Z (CASE STUDY: CRUSHER MASTER PLAN PROJECT)
by: ULYA HIDAYAT (NIM: 29107144), AKHMAD -
Company strategic analysis case study of PT Freeport Indonesia
by: , ENDARTO, Kus, et al.
Published: (2001) -
AVAILABILITY IMPROVEMENT ON NORTH SOUTH CRUSHING PLANT AT PT FREEPORT INDONESIA
by: HASOLOAN LUBIS (NIM: 29107133); Pembimbing: Dr. Ir. Mursyid Hasan Basri, ROBERT -
VERTICAL PRESSURE AIR MOISTURE MODEL DEWATERING PLANT PT. FREEPORT INDONESIA
by: VARIANEMIL (NIM : 125 06 014), DARIUS