UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY
Water is a natural resource that that has important role in supporting the activities of living things and other components in the environment. Humans use water to fulfill and perform their daily activities. Ulu Gadut Water Treatment Plant (WTP) I is one of WTP in Padang City that serves two distric...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22043 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:22043 |
---|---|
spelling |
id-itb.:220432017-09-28T11:25:12ZUPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY YUSRI (NIM : 15313020), FAIDIL Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22043 Water is a natural resource that that has important role in supporting the activities of living things and other components in the environment. Humans use water to fulfill and perform their daily activities. Ulu Gadut Water Treatment Plant (WTP) I is one of WTP in Padang City that serves two districts, it are Pauh and Lubuk Kilangan district. Based on the projection of the community's water demand for the 10 years, the operational flow rate of WTP of 80 L/s will not be sufficient. Therefore, it is necessary to uprating the capacity of water production in WTP. Planned capacity will be increased from 80 L/s to 160 L/s. The principle of WTP uprating are based on the maximum utilization concept of existing installations and adds new units to refine and increase existing capacity. The cost required to uprating the capacity of Ulu Gadut WTP I is Rp2,307,567,100.00. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Water is a natural resource that that has important role in supporting the activities of living things and other components in the environment. Humans use water to fulfill and perform their daily activities. Ulu Gadut Water Treatment Plant (WTP) I is one of WTP in Padang City that serves two districts, it are Pauh and Lubuk Kilangan district. Based on the projection of the community's water demand for the 10 years, the operational flow rate of WTP of 80 L/s will not be sufficient. Therefore, it is necessary to uprating the capacity of water production in WTP. Planned capacity will be increased from 80 L/s to 160 L/s. The principle of WTP uprating are based on the maximum utilization concept of existing installations and adds new units to refine and increase existing capacity. The cost required to uprating the capacity of Ulu Gadut WTP I is Rp2,307,567,100.00. |
format |
Final Project |
author |
YUSRI (NIM : 15313020), FAIDIL |
spellingShingle |
YUSRI (NIM : 15313020), FAIDIL UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY |
author_facet |
YUSRI (NIM : 15313020), FAIDIL |
author_sort |
YUSRI (NIM : 15313020), FAIDIL |
title |
UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY |
title_short |
UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY |
title_full |
UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY |
title_fullStr |
UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY |
title_full_unstemmed |
UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY |
title_sort |
uprating ulu gadut water treatment plant i in padang city |
url |
https://digilib.itb.ac.id/gdl/view/22043 |
_version_ |
1821120650704584704 |