UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY

Water is a natural resource that that has important role in supporting the activities of living things and other components in the environment. Humans use water to fulfill and perform their daily activities. Ulu Gadut Water Treatment Plant (WTP) I is one of WTP in Padang City that serves two distric...

Full description

Saved in:
Bibliographic Details
Main Author: YUSRI (NIM : 15313020), FAIDIL
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22043
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22043
spelling id-itb.:220432017-09-28T11:25:12ZUPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY YUSRI (NIM : 15313020), FAIDIL Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22043 Water is a natural resource that that has important role in supporting the activities of living things and other components in the environment. Humans use water to fulfill and perform their daily activities. Ulu Gadut Water Treatment Plant (WTP) I is one of WTP in Padang City that serves two districts, it are Pauh and Lubuk Kilangan district. Based on the projection of the community's water demand for the 10 years, the operational flow rate of WTP of 80 L/s will not be sufficient. Therefore, it is necessary to uprating the capacity of water production in WTP. Planned capacity will be increased from 80 L/s to 160 L/s. The principle of WTP uprating are based on the maximum utilization concept of existing installations and adds new units to refine and increase existing capacity. The cost required to uprating the capacity of Ulu Gadut WTP I is Rp2,307,567,100.00. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Water is a natural resource that that has important role in supporting the activities of living things and other components in the environment. Humans use water to fulfill and perform their daily activities. Ulu Gadut Water Treatment Plant (WTP) I is one of WTP in Padang City that serves two districts, it are Pauh and Lubuk Kilangan district. Based on the projection of the community's water demand for the 10 years, the operational flow rate of WTP of 80 L/s will not be sufficient. Therefore, it is necessary to uprating the capacity of water production in WTP. Planned capacity will be increased from 80 L/s to 160 L/s. The principle of WTP uprating are based on the maximum utilization concept of existing installations and adds new units to refine and increase existing capacity. The cost required to uprating the capacity of Ulu Gadut WTP I is Rp2,307,567,100.00.
format Final Project
author YUSRI (NIM : 15313020), FAIDIL
spellingShingle YUSRI (NIM : 15313020), FAIDIL
UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY
author_facet YUSRI (NIM : 15313020), FAIDIL
author_sort YUSRI (NIM : 15313020), FAIDIL
title UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY
title_short UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY
title_full UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY
title_fullStr UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY
title_full_unstemmed UPRATING ULU GADUT WATER TREATMENT PLANT I IN PADANG CITY
title_sort uprating ulu gadut water treatment plant i in padang city
url https://digilib.itb.ac.id/gdl/view/22043
_version_ 1821120650704584704