#TITLE_ALTERNATIVE#

PMA or Part Manufacturer Approval is a combined approval in design and <br /> <br /> <br /> production for modification or replacement part and article for Type Certificated <br /> <br /> <br /> Product. Company registered as PMA holder hereby able to produce...

Full description

Saved in:
Bibliographic Details
Main Author: PUTRI SITUMORANG (NIM: 13612035), FEBRINA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22128
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22128
spelling id-itb.:221282017-10-09T10:33:27Z#TITLE_ALTERNATIVE# PUTRI SITUMORANG (NIM: 13612035), FEBRINA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22128 PMA or Part Manufacturer Approval is a combined approval in design and <br /> <br /> <br /> production for modification or replacement part and article for Type Certificated <br /> <br /> <br /> Product. Company registered as PMA holder hereby able to produce and sell aircraft <br /> <br /> <br /> parts and articles within the regulated area. The absence of local PMA in Indonesia <br /> <br /> <br /> resulting in aircraft operator reliance upon foreign made spare part. Hence, n order to <br /> <br /> <br /> seize the local market, a feasibility study of to build a PMA organizations in <br /> <br /> <br /> Indonesia is required, by taking the example of spring pocket component as a <br /> <br /> <br /> production object. <br /> <br /> <br /> There are several processes undertaken in conducting feasibility studies. This <br /> <br /> <br /> process is related to several aspects such as market aspects, technical aspects, <br /> <br /> <br /> economic aspects and regulatory aspects. Non-parametric methods is used to analyze <br /> <br /> <br /> the part’s reliability by using historical data. This reliability data hence used as input <br /> <br /> <br /> for later iteration to determine the feasibility of spring pocket production. <br /> <br /> <br /> The feasibility study result shows that the production of spring pocket is not <br /> <br /> <br /> profitable economically. Therefore it is necessary to expand the production capability <br /> <br /> <br /> for other components which can be expected to cover the loss of spring pocket <br /> <br /> <br /> production segment. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PMA or Part Manufacturer Approval is a combined approval in design and <br /> <br /> <br /> production for modification or replacement part and article for Type Certificated <br /> <br /> <br /> Product. Company registered as PMA holder hereby able to produce and sell aircraft <br /> <br /> <br /> parts and articles within the regulated area. The absence of local PMA in Indonesia <br /> <br /> <br /> resulting in aircraft operator reliance upon foreign made spare part. Hence, n order to <br /> <br /> <br /> seize the local market, a feasibility study of to build a PMA organizations in <br /> <br /> <br /> Indonesia is required, by taking the example of spring pocket component as a <br /> <br /> <br /> production object. <br /> <br /> <br /> There are several processes undertaken in conducting feasibility studies. This <br /> <br /> <br /> process is related to several aspects such as market aspects, technical aspects, <br /> <br /> <br /> economic aspects and regulatory aspects. Non-parametric methods is used to analyze <br /> <br /> <br /> the part’s reliability by using historical data. This reliability data hence used as input <br /> <br /> <br /> for later iteration to determine the feasibility of spring pocket production. <br /> <br /> <br /> The feasibility study result shows that the production of spring pocket is not <br /> <br /> <br /> profitable economically. Therefore it is necessary to expand the production capability <br /> <br /> <br /> for other components which can be expected to cover the loss of spring pocket <br /> <br /> <br /> production segment.
format Final Project
author PUTRI SITUMORANG (NIM: 13612035), FEBRINA
spellingShingle PUTRI SITUMORANG (NIM: 13612035), FEBRINA
#TITLE_ALTERNATIVE#
author_facet PUTRI SITUMORANG (NIM: 13612035), FEBRINA
author_sort PUTRI SITUMORANG (NIM: 13612035), FEBRINA
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/22128
_version_ 1821120676488019968