PEMILIHAN RENCANA KAPASITAS PEMBANGKITAN LISTRIK YANG PALING LAYAK PADA SUATU PROYEK PANAS BUMI BERDASARKAN ANALISIS TEKNIKAL DAN FINANSIAL
Determining geothermal capacity is one of uncertainty in the beginning of a <br /> <br /> geothermal project. Until recently there is no certain procedure to determine <br /> <br /> optimum capacity to be generated in a geothermal power project. Thus the actual <br /> &...
Saved in:
Main Author: | OKTAVIANI PURWANINGSIH (NIM: 22614012), FITRI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22191 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Pemilihan Proyek Pembangunan Pembangkit Listrik Dengan Metode Analytical Hierarchy Process (AHP) di PT. Pembangkitan Jawa Bali (PT. PJB)
by: HERU BUDI PRATOMO, 041614353023
Published: (2019) -
PEMANFAATAN LIMBAH LUMPUR PANAS BUMI DARI PEMBANGKIT LISTRIK TENAGA PANAS BUMI DIENG SEBAGAI BAHAN POZZOLAN
by: , NANANG NURDIYANTO, et al.
Published: (2011) -
PEMANFAATAN PANAS PADA KOMPOR GAS LPG UNTUK PEMBANGKITAN ENERGI LISTRIK MENGGUNAKAN GENERATOR THERMOELEKTRIK
by: Sugiyanto, Sugiyanto, et al.
Published: (2013) -
PEMBANGKITAN LISTRIK MENGGUNAKAN GENERATOR THERMOELECTRIC BERPENDINGIN KIPAS DENGAN
MEMANFAATKAN PANAS KOMPOR GAS LPG
by: , ILYAS, et al.
Published: (2014) -
Pemanfaatan Panas Buang di Muffler Kendaraan Roda Dua untuk Pembangkitan Listrik Menggunakan Thermoelektrik Generator
by: Sugiyanto, Sugiyanto, et al.
Published: (2011)