THE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK

Dump truck that is used to distribute mining products from the site to the the material processing location is one of the important heavy transport for the companies. The unavailibility of a dump truck may cause the company to suffer financial loss for about US $ 1 million per day (Jack and Murthy,...

Full description

Saved in:
Bibliographic Details
Main Author: FRISKA RAMADHIAN (10112080), FOPI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22198
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22198
spelling id-itb.:221982017-09-27T11:43:14ZTHE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK FRISKA RAMADHIAN (10112080), FOPI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22198 Dump truck that is used to distribute mining products from the site to the the material processing location is one of the important heavy transport for the companies. The unavailibility of a dump truck may cause the company to suffer financial loss for about US $ 1 million per day (Jack and Murthy, 2007). Therefore it is necessary to create a maintenance system in order to minimize the failure rate of the dump truck. One of them is to perform maintenance service contracts. In this research, the contract services performed is minimal repairs of Corrective Maintenance (CM) and reduction of the failure rate of imperfect Preventive Maintenance (PM). There are 2 options of service contract offered, the first one is the agent bear the full cost of PM and CM and the agent only bear the CM as the second one. By using the Accelerated Failure Time and Markov Chain model developed by Husniah, H., et al 2015), an evaluation of the service contract cost by determining the maintenance time period and the optimal cost on vehicles in dynamic conditions. Based on the data used, Option 1 give better result with a Rp.30.343.000 profit for one-year service contract with the amount of PM is 3 and the 103 days of interval between PM. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Dump truck that is used to distribute mining products from the site to the the material processing location is one of the important heavy transport for the companies. The unavailibility of a dump truck may cause the company to suffer financial loss for about US $ 1 million per day (Jack and Murthy, 2007). Therefore it is necessary to create a maintenance system in order to minimize the failure rate of the dump truck. One of them is to perform maintenance service contracts. In this research, the contract services performed is minimal repairs of Corrective Maintenance (CM) and reduction of the failure rate of imperfect Preventive Maintenance (PM). There are 2 options of service contract offered, the first one is the agent bear the full cost of PM and CM and the agent only bear the CM as the second one. By using the Accelerated Failure Time and Markov Chain model developed by Husniah, H., et al 2015), an evaluation of the service contract cost by determining the maintenance time period and the optimal cost on vehicles in dynamic conditions. Based on the data used, Option 1 give better result with a Rp.30.343.000 profit for one-year service contract with the amount of PM is 3 and the 103 days of interval between PM.
format Final Project
author FRISKA RAMADHIAN (10112080), FOPI
spellingShingle FRISKA RAMADHIAN (10112080), FOPI
THE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK
author_facet FRISKA RAMADHIAN (10112080), FOPI
author_sort FRISKA RAMADHIAN (10112080), FOPI
title THE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK
title_short THE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK
title_full THE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK
title_fullStr THE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK
title_full_unstemmed THE MARKOV MODEL ON HEAVY TRANSPORT MAINTENANCE SERVICE CONTRACTS CASE STUDY: DUMP TRUCK
title_sort markov model on heavy transport maintenance service contracts case study: dump truck
url https://digilib.itb.ac.id/gdl/view/22198
_version_ 1822920434145820672