THE DESIGN OF INTERACTIVE MINE FORECASTING SYSTEM TO IMPROVE MINE PLANNING PERFORMANCE
One of Freeport McMoRan's subsidiaries (FCX) is P.T. Freeport Indonesia (PTFI) which is <br /> <br /> <br /> a mining company produced copper, gold and silver concentrate. PT Freeport Indonesia was <br /> <br /> <br /> granted an operating license called...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22582 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | One of Freeport McMoRan's subsidiaries (FCX) is P.T. Freeport Indonesia (PTFI) which is <br />
<br />
<br />
a mining company produced copper, gold and silver concentrate. PT Freeport Indonesia was <br />
<br />
<br />
granted an operating license called Contract of Work in 1967 for a 30-year operating period from <br />
<br />
<br />
1973. The next Contract of Work was signed in 1991 for the second 30-year period. At present, <br />
<br />
<br />
mining operations are carried out with two methods: Open Pit (surface mine) and underground <br />
<br />
<br />
mines. Grasberg is the only one open pit in the district, which was discovered in 1988 and began <br />
<br />
<br />
to mine in 1990. If Plan-17Q2R3 achieved, Grasberg depletion is at the end of 2018. <br />
<br />
<br />
Grasberg Long Range Planning Section leads the updating metal forecasts quarterly, despite <br />
<br />
<br />
of taking care the Grasberg panning itself. In recent years, the completion of the work is quite <br />
<br />
<br />
often over time. The head of the planning team tried to analyze this problem and sought to improve <br />
<br />
<br />
the forecasting performance by using both qualitative and quantitative approaches. The qualitative <br />
<br />
<br />
approach includes detailed observation of the planning process to find out the constraints ever, <br />
<br />
<br />
followed by a literature study to define effective and efficient improvement methods. At the stage <br />
<br />
<br />
of problem formulation, a method of thinking in the Theory of Constituency called the Current <br />
<br />
<br />
Reality Tree (CRT) is used to understand the causes and effects of a series of problems in order <br />
<br />
<br />
to formulate the root cause, further designing the system improvements. <br />
<br />
<br />
The main problems faced are time constraints, manual work system, and found disintegrated <br />
<br />
<br />
mine-mill model. Through a series of meetings, the team decided to create an alternative planning <br />
<br />
<br />
system called Mine Planning Interactive (MPI). This system can expedite the planning simulation <br />
<br />
<br />
from more than four hours or even one day to become less than one hour per one scenario. <br />
<br />
<br />
A quantitative approach was used to verify the MPI performance. With two cases have been <br />
<br />
<br />
run, variances of the result was estimated about three to five percent. Management has accepted <br />
<br />
<br />
to use MPI to run multiple cases study if any, and to use it side by side with the current <br />
<br />
<br />
conventional. However, this system has not yet perfect. There is still chance to improve it, for <br />
<br />
<br />
instance it needs to integrate the equipment hour’s calculation also, especially the truck hour’s <br />
<br />
<br />
calculation. |
---|