STUDY OVERBUDEN FRAGMENTATION BY BLASTING RESULT USING AIRDECK METHOD (COMBINATION MIDDLE AND BOTTOM AIRDECK) OF DIGGING TIME EXCAVATOR EX – 3600 AND PC – 4000 AT MINE COAL PT BUMA JOB SITE LATI, EAST BORNEO, INDONESIA

Mining activities begins with overburden removal. Before overbuden excavated, the rocks must broken used the drill-blasting method. The drilling activity was carried out using Atlas Copco DM 45 drill kit, type of drill used was a 7 7/8 inchi with tricon roller bit. Pattern drilling used is stagger...

Full description

Saved in:
Bibliographic Details
Main Author: YOSNANDA (NIM : 12113029), JAYA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22678
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia