STUDY OVERBUDEN FRAGMENTATION BY BLASTING RESULT USING AIRDECK METHOD (COMBINATION MIDDLE AND BOTTOM AIRDECK) OF DIGGING TIME EXCAVATOR EX ̉̉ 3600 AND PC ̉̉ 4000 AT MINE COAL PT BUMA JOB SITE LATI, EAST BORNEO, INDONESIA
Mining activities begins with overburden removal. Before overbuden excavated, the rocks must broken used the drill-blasting method. The drilling activity was carried out using Atlas Copco DM 45 drill kit, type of drill used was a 7 7/8 inchi with tricon roller bit. Pattern drilling used is stagger...
Saved in:
Main Author: | YOSNANDA (NIM : 12113029), JAYA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/22678 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A design of a 3,600 kw power plants
by: Murillo, George
Published: (1962) -
A 3600-kw steam turbine power plant
by: Limdico, Basilio L.
Published: (1962) -
A design of a 3,600 kw steam electric generating plant
by: Estrella, Deogracias
Published: (1962) -
A design of a 3,600-kw steam turbine power plant
by: Rogers, Ross B.
Published: (1962) -
A project study on the installation of a 3600-BBL dry process cement plant
by: Liwanag, Otello B.
Published: (1964)