ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB

ESTIMATING CONSTRUCTION COST <br /> <br /> <br /> CENTER OF ARTS, DESIGN AND LANGUAGE-ITB <br /> <br /> <br /> Construction project is a group of construction activity which related each other and is done by limited resources accompanied to create civil struct...

Full description

Saved in:
Bibliographic Details
Main Author: GUNAWAN )NIM: 15011145), KEVIN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/22786
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:22786
spelling id-itb.:227862017-09-27T10:25:50ZESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB GUNAWAN )NIM: 15011145), KEVIN Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/22786 ESTIMATING CONSTRUCTION COST <br /> <br /> <br /> CENTER OF ARTS, DESIGN AND LANGUAGE-ITB <br /> <br /> <br /> Construction project is a group of construction activity which related each other and is done by limited resources accompanied to create civil structure or any other physical facilities desired. One of the resources that need to be planned to create civil structure or any other physical facilities is financial resources. Financial resources need to be planned and controlled as effectively and efficiently as possible to create a good construction project. Planning and controlling financial resources started when construction cost estimating began. In this final project for Center of Arts, Design and Language-ITB building, construction cost estimation is done by resource enumeration method. This method is done by calculating resources that need to be supplied as the initial data for estimating construction cost. Estimating construction cost for this final project with resource enumeration method give final estimation Rp 35.380.679.752,69 (roundup Rp 35.380.680.000,00) for bidding to the owner. S Curve is a tool for controlling financial flow in construction project so accurately with financial plan or early cost estimation. With S Curve, contractor can see the resource consumption in field and as planned (S Curve with early cost estimation). With this S Curve also, contractor can see the progress of this project so contractor can take any decision in the future (adjusting resource for any early or late progress). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ESTIMATING CONSTRUCTION COST <br /> <br /> <br /> CENTER OF ARTS, DESIGN AND LANGUAGE-ITB <br /> <br /> <br /> Construction project is a group of construction activity which related each other and is done by limited resources accompanied to create civil structure or any other physical facilities desired. One of the resources that need to be planned to create civil structure or any other physical facilities is financial resources. Financial resources need to be planned and controlled as effectively and efficiently as possible to create a good construction project. Planning and controlling financial resources started when construction cost estimating began. In this final project for Center of Arts, Design and Language-ITB building, construction cost estimation is done by resource enumeration method. This method is done by calculating resources that need to be supplied as the initial data for estimating construction cost. Estimating construction cost for this final project with resource enumeration method give final estimation Rp 35.380.679.752,69 (roundup Rp 35.380.680.000,00) for bidding to the owner. S Curve is a tool for controlling financial flow in construction project so accurately with financial plan or early cost estimation. With S Curve, contractor can see the resource consumption in field and as planned (S Curve with early cost estimation). With this S Curve also, contractor can see the progress of this project so contractor can take any decision in the future (adjusting resource for any early or late progress).
format Final Project
author GUNAWAN )NIM: 15011145), KEVIN
spellingShingle GUNAWAN )NIM: 15011145), KEVIN
ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB
author_facet GUNAWAN )NIM: 15011145), KEVIN
author_sort GUNAWAN )NIM: 15011145), KEVIN
title ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB
title_short ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB
title_full ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB
title_fullStr ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB
title_full_unstemmed ESTIMATING CONSTRUCTION COST CENTER OF ARTS, DESIGN AND LANGUAGE-ITB
title_sort estimating construction cost center of arts, design and language-itb
url https://digilib.itb.ac.id/gdl/view/22786
_version_ 1821120879533228032