STUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM

The criteria of drinking water supply system planning consist of raw water component, production, and service, which is a unity. Implementation of Optimal Management Tilong dam Management increased the capacity of Tilong dam from 150 lps to 350 lps. The addition of tha capacity of 200 lps is designe...

Full description

Saved in:
Bibliographic Details
Main Author: Baok ( NIM : 25714308 ), Meny
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23044
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23044
spelling id-itb.:230442017-10-02T11:13:12ZSTUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM Baok ( NIM : 25714308 ), Meny Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23044 The criteria of drinking water supply system planning consist of raw water component, production, and service, which is a unity. Implementation of Optimal Management Tilong dam Management increased the capacity of Tilong dam from 150 lps to 350 lps. The addition of tha capacity of 200 lps is designed to develop a new water supply system in term to term to meet the domestic, municipality and industry demand in Regional Kupang that covers Kota Kupang and Kabupaten Kupang. The study purpose is to determine the technical and financial eligibility of the Tilong II water supply system which is the service area consists of Zona Tarus and Zona Noelbaki. The research conducted by projecting the population to determine the domestic and non domestic demand of water, hidrolyc analysis with EPANET, and financial analysis with Net Present Value (NPV), Internal Rate of Return (IRR) and Break Event Poin (BEP). The development of Tilong Water Supply System consists of intake system, water treatment procces with filtration and decinfection units, distribution pipe network, with investment cost of Rp. 32.883.658.500. Financial analysis with various tariff of PDAM, ATP, and FCR tariff resulting a positive value for NPV, IRR > interest rate, and break event point obtained in 5,85 years for FCR tariff that indicate that the project is financial fesible if the FCR tariff is implemented. The chosen funding scheme is for raw water unit 100% is funded by Direktorat Jenderal Sumber Day Air, production unit 50% is funded Direktorat Jenderal Cipta Karya and 50% from bank loans, distribution unit 50% is funded by APBD and 50% from bank loans. <br /> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The criteria of drinking water supply system planning consist of raw water component, production, and service, which is a unity. Implementation of Optimal Management Tilong dam Management increased the capacity of Tilong dam from 150 lps to 350 lps. The addition of tha capacity of 200 lps is designed to develop a new water supply system in term to term to meet the domestic, municipality and industry demand in Regional Kupang that covers Kota Kupang and Kabupaten Kupang. The study purpose is to determine the technical and financial eligibility of the Tilong II water supply system which is the service area consists of Zona Tarus and Zona Noelbaki. The research conducted by projecting the population to determine the domestic and non domestic demand of water, hidrolyc analysis with EPANET, and financial analysis with Net Present Value (NPV), Internal Rate of Return (IRR) and Break Event Poin (BEP). The development of Tilong Water Supply System consists of intake system, water treatment procces with filtration and decinfection units, distribution pipe network, with investment cost of Rp. 32.883.658.500. Financial analysis with various tariff of PDAM, ATP, and FCR tariff resulting a positive value for NPV, IRR > interest rate, and break event point obtained in 5,85 years for FCR tariff that indicate that the project is financial fesible if the FCR tariff is implemented. The chosen funding scheme is for raw water unit 100% is funded by Direktorat Jenderal Sumber Day Air, production unit 50% is funded Direktorat Jenderal Cipta Karya and 50% from bank loans, distribution unit 50% is funded by APBD and 50% from bank loans. <br /> <br />
format Theses
author Baok ( NIM : 25714308 ), Meny
spellingShingle Baok ( NIM : 25714308 ), Meny
STUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM
author_facet Baok ( NIM : 25714308 ), Meny
author_sort Baok ( NIM : 25714308 ), Meny
title STUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM
title_short STUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM
title_full STUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM
title_fullStr STUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM
title_full_unstemmed STUDY OF REGIONAL KUPANG WATER SUPPLY SYSTEM DEVELOPMENT – SOURCE WATER MULTI PURPOSE TILONG DAM
title_sort study of regional kupang water supply system development ãƒâ€šã‚– source water multi purpose tilong dam
url https://digilib.itb.ac.id/gdl/view/23044
_version_ 1821120955647262720