#TITLE_ALTERNATIVE#

Wayang Windu geothermal field lies between Wayang Mt, Windu Mt and Malabar Mt volcanic zones. This geothermal field starts to produce steam on June 2000 with capacity production of 227 MWe from two unit productions. At MBB-1 well, three schemes of hydraulic stimulation have been carried out, i.e. in...

Full description

Saved in:
Bibliographic Details
Main Author: USWATUN HASANAH (NIM : 22310013), MIA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23063
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia