#TITLE_ALTERNATIVE#
Wayang Windu geothermal field lies between Wayang Mt, Windu Mt and Malabar Mt volcanic zones. This geothermal field starts to produce steam on June 2000 with capacity production of 227 MWe from two unit productions. At MBB-1 well, three schemes of hydraulic stimulation have been carried out, i.e. in...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23063 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!