RISK MANAGEMENT OF GAS PRODUCTION PHASE USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD AT SENORO GAS FIELD JOB PERTAMINA-MEDCO TOMORI SULAWESI
Upstream oil and gas industry in Indonesia nowadays still become crucial commodities that is <br /> <br /> <br /> <br /> expected to contribute into nation income, even in the world’s current condition which are <br /> <br /> <br /> <br /> r...
Saved in:
Main Author: | Ray Akbar Mutalibov 29115113, Mohammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23123 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Evaluasi kesiapan implementasi CRM dengan metoda analytical hierarchy process (AHP) :: Studi kasus di Unit Bisnis Aviasi Pertamina
by: , HIDAYAT, Affan, et al.
Published: (2009) -
Determining case timeliness using analytic hierarchy process (AHP)
by: Calimag, Maria Rizza M.
Published: (2007) -
Teaching analytic hierarchy process (AHP) in undergraduate chemical engineering courses
by: Promentilla, Michael Angelo B., et al.
Published: (2018) -
ANALISIS PERMILIHAN KARTU KREDIT DENGAN METODE THE ANALYTICAL HIERARCHY PROCESS (AHP)
by: , Chitra Tri Jayanti S., et al.
Published: (2012) -
Evaluating climate change mitigation options in the Philippines with analytic hierarchy process (AHP)
by: Promentilla, Michael Angelo B., et al.
Published: (2013)