CONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK

Constructuion management is a technique in construction project to manage its resource (labor, material, equipment, money, and time) effectively and efficiently with certain quality. This final project will discuss construction management in Apartemen dan Pusat Perbelanjaan Arcamanik, Bandung. The s...

Full description

Saved in:
Bibliographic Details
Main Author: RIFAN FAUZAN GHOFIR (15013087), M.
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23135
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23135
spelling id-itb.:231352017-09-27T10:25:52ZCONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK RIFAN FAUZAN GHOFIR (15013087), M. Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23135 Constructuion management is a technique in construction project to manage its resource (labor, material, equipment, money, and time) effectively and efficiently with certain quality. This final project will discuss construction management in Apartemen dan Pusat Perbelanjaan Arcamanik, Bandung. The scope of this construction management include construction method planning, scheduleing, and construction cost estimating. <br /> <br /> <br /> Before that, job desctiption are required to known and will use work breakdown structure method. Construction method planning include quantity take off, determinating order and method of works, and construction equipment planning. In scheduleing, duration of work are determined by productivity of labor or equipment based of its resource lead then combined with logic sequence in Ms. Project. Then, in last phase, construction cost estimation take places by resource enumetarion method include estimating direct cost (labor, material, and equipment) and estimating indirect cost (overhead, contigencies, profit, taxes, and insurances). Finally, the output of this final project are Budget and Implementation Plan and S Curve. <br /> <br /> <br /> The planned work include preparation work, soil and substructure work, upper structure work, drainage work, and pavement work. Total project duration required is 695 days with implementation cost plan Rp 315.442.741.800 and Budget Cost Plan Rp 400.934.890.400. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Constructuion management is a technique in construction project to manage its resource (labor, material, equipment, money, and time) effectively and efficiently with certain quality. This final project will discuss construction management in Apartemen dan Pusat Perbelanjaan Arcamanik, Bandung. The scope of this construction management include construction method planning, scheduleing, and construction cost estimating. <br /> <br /> <br /> Before that, job desctiption are required to known and will use work breakdown structure method. Construction method planning include quantity take off, determinating order and method of works, and construction equipment planning. In scheduleing, duration of work are determined by productivity of labor or equipment based of its resource lead then combined with logic sequence in Ms. Project. Then, in last phase, construction cost estimation take places by resource enumetarion method include estimating direct cost (labor, material, and equipment) and estimating indirect cost (overhead, contigencies, profit, taxes, and insurances). Finally, the output of this final project are Budget and Implementation Plan and S Curve. <br /> <br /> <br /> The planned work include preparation work, soil and substructure work, upper structure work, drainage work, and pavement work. Total project duration required is 695 days with implementation cost plan Rp 315.442.741.800 and Budget Cost Plan Rp 400.934.890.400.
format Final Project
author RIFAN FAUZAN GHOFIR (15013087), M.
spellingShingle RIFAN FAUZAN GHOFIR (15013087), M.
CONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK
author_facet RIFAN FAUZAN GHOFIR (15013087), M.
author_sort RIFAN FAUZAN GHOFIR (15013087), M.
title CONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK
title_short CONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK
title_full CONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK
title_fullStr CONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK
title_full_unstemmed CONSTRUCTION MANAGEMENT PLANNING APARTEMEN DAN PUSAT PERBELANJAAN ARCAMANIK
title_sort construction management planning apartemen dan pusat perbelanjaan arcamanik
url https://digilib.itb.ac.id/gdl/view/23135
_version_ 1821120983051796480