OPTIMIZATION OF WASTE MANAGEMENT SYSTEM CASE STUDY: KEBUN BINATANG BANDUNG TRANSFER STATION
Based on observations in the field, transportation of garbage from Kebun Binatang Bandung Transfer Station to Sarimukti Final Processing Site is in a state of over capacity. Excess capacity can be reduced through the waste sorting at the Transfer Station when unloading wheel to containers that requi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23474 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!