IMPLEMENTATION OF PERFORMANCE SHAPING FACTOR (PSF)-BASED RISK ASSESSMENT AND HUMAN ERROR ASSESSMENT AND REDUCTION TECHNIQUE (HEART) AT THE ITB STUDENT DORMITORY BUILDING C AND D CONSTRUCTION PROJECT
Construction sector is one of the main pillars in the economic development of the world, including Indonesia. However, the number of accidents in the construction sector is still relatively high until now. 60 to 70 percent of occupational accidents in many employment sectors are caused by human erro...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23492 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Construction sector is one of the main pillars in the economic development of the world, including Indonesia. However, the number of accidents in the construction sector is still relatively high until now. 60 to 70 percent of occupational accidents in many employment sectors are caused by human errors. A systematic analysis of the human error can be used to prevent accidents. Therefore, the analysis of human error is important to be implemented, particularly with regard to health and safety in the construction industry. The objectives of this study were to know the stages/ types of work with the greatest risk, to know the type of occupational accident with the highest HEP (human error probability), to know the main cause of human error occurred, as well as to know the implementation of health and safety in the project based on human error analysis performed. The methods used in this research were PSF (performance shaping factor)-based risk assessment and HEART (human error assessment and reduction technique). The primary data were obtained through interview, observation, and documentation. Secondary data needed were occupational accidents data and work procedures from the project health and safety expert. Based on the PSF-based risk assessment method, it was known that the type of work with the highest risk occurred in the installation of iron reinforcement by means of welding to steel columns or beams, from columns and beams work and concrete canopy work, with the risk value of 24 (of 24), which came from fall from height hazard. While the HEART method showed that the fall from height accident had the highest HEP value (4,75) among any other accidents. The main cause of the human error occurred in the project was the absence of complete written procedures for workers. Based on the analysis performed, it could be known that the company needed to improve the implementation of health and safety in the project, which could be done systematically, started from the employers, safety supervisor, and workers. <br />
<br />
|
---|