#TITLE_ALTERNATIVE#
There are delays on several executions of Aircraft C-Check Maintenance on Boeing 737-800. Based on observations and C-Check data of eight Boeing 737-800 aircrafts, Turn Around Time target fulfillment compliance is 69%. According to that, a new improvement method to reduce unproductive and non value...
Saved in:
Main Author: | PRINA GASTRIANI (NIM : 13611023), OVI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23645 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: PUSPA KANIA NIM: 20715313, PRINA -
#TITLE_ALTERNATIVE#
by: PRASETYO SUWARGO (NIM 28195016), OVI -
A QUALITY COMPONENT OF AIRCRAFT MAINTENANCE USING MAINTENANCE PLANNING AND SCHEDULING PRINCIPLES. CASE STUDY C-CHECK BOEING 737-800
by: PRIMA GASTRIANI, OVI -
#TITLE_ALTERNATIVE#
by: PRIYATNA (NIM:10207036); Pembimbing : Dr. Eng. Enjang Jaenal Mustopa, PRINA -
#TITLE_ALTERNATIVE#
by: Chandra Kriswanto (NIM 15002010 ) ; Eka Susanto NIM 15002010 (NIM 15002095), Aqri