#TITLE_ALTERNATIVE#

Hydrate and wax are going to be one of problem at oil and gas company along with the development of oil and gas production in the deep sea. Bigness of the cost which has to take if these problems are not taken care preventively has made the development of preventive way take care wax and hydrate pro...

Full description

Saved in:
Bibliographic Details
Main Author: SUMIRAT (NIM: 12206099), TITO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24552
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:24552
spelling id-itb.:245522017-09-27T10:37:32Z#TITLE_ALTERNATIVE# SUMIRAT (NIM: 12206099), TITO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/24552 Hydrate and wax are going to be one of problem at oil and gas company along with the development of oil and gas production in the deep sea. Bigness of the cost which has to take if these problems are not taken care preventively has made the development of preventive way take care wax and hydrate problem itself. One of the way is by doing insulator installment for the pipe. This way has to be done as optimal as so that the design itself is not overprotective, and the cost will be more economist. <br /> <br /> <br /> This paper study about the method optimizes the use of insulator at a field. In this paper, the X Field, which one of offshore field with wax and hydrate potent, will be used as a study object. Insulator is optimized from its material, and its thickness by using the OLGA simulator. Wax curve and hydrate curve which are generated by using PVTsim are used as a success reference of the insulator installment, because they can predict when the wax and hydrate will be occurred for a fix pressure. And what is more, it is accounted the factors which are influenced to string out wax and hydrate such as GOR (Gas Oil Ratio) and Water cut. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Hydrate and wax are going to be one of problem at oil and gas company along with the development of oil and gas production in the deep sea. Bigness of the cost which has to take if these problems are not taken care preventively has made the development of preventive way take care wax and hydrate problem itself. One of the way is by doing insulator installment for the pipe. This way has to be done as optimal as so that the design itself is not overprotective, and the cost will be more economist. <br /> <br /> <br /> This paper study about the method optimizes the use of insulator at a field. In this paper, the X Field, which one of offshore field with wax and hydrate potent, will be used as a study object. Insulator is optimized from its material, and its thickness by using the OLGA simulator. Wax curve and hydrate curve which are generated by using PVTsim are used as a success reference of the insulator installment, because they can predict when the wax and hydrate will be occurred for a fix pressure. And what is more, it is accounted the factors which are influenced to string out wax and hydrate such as GOR (Gas Oil Ratio) and Water cut.
format Final Project
author SUMIRAT (NIM: 12206099), TITO
spellingShingle SUMIRAT (NIM: 12206099), TITO
#TITLE_ALTERNATIVE#
author_facet SUMIRAT (NIM: 12206099), TITO
author_sort SUMIRAT (NIM: 12206099), TITO
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/24552
_version_ 1822020427718852608