EFFECT OFWELLBORE HYDRAULIC TO CRITICAL RATE AND OPTIMUM RATE OF HORIZONTAL WELL IN RESERVOIR WITH THE BOTTOM WATER DRIVE
Establishment of water cresting is a natural phenomenon that often occurs in horizontal wells (such as water coning in vertical well). Water cresting occurs when production of the well exceeds the critical production rate, where the critical flow rate is the minimum production rate that causes the s...
Saved in:
主要作者: | YANUARTO (NIM: 22208038), YOGI |
---|---|
格式: | Theses |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/24786 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
EFFECT OF ANISOTROPY ON MULTILATERAL WELL PERFORMANCE IN BOTTOM WATER DRIVE RESERVOIR
由: Laurent Fine
出版: (2013) -
DESIGN OF HYDRAULIC FRACTURING HORIZONTAL WELL ON SHALE GAS RESERVOIR
由: Adi Kusuma, Rangga -
A PREDICTIVE METHOD FOR VERTICAL WELL PERFORMANCE IN BOTTOM WATER DRIVE RESERVOIR
由: SATIM (NIM : 22208318) , ADEK -
COMPARISON BETWEEN HYDRAULIC FRACTURING AND HORIZONTAL WELL IN THINLY BEDDED TIGHT RESERVOIR
由: Handarianto, Hidayat -
A NEW CORRELATION TO DETERMINE HYDRAULIC FRACTURING EFFICIENCY FOR A HYDRAULICALLY FRACTURED HORIZONTAL WELL IN A CARBONATE RESERVOIR
由: Leonardus, Steven