PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
Water coning is a usual phenomenon occurred in a vertical production well especially in the reservoir that having aquifer underneath. This phenomenon caused by water from the water bearing zone flowing upward to the perforation hole and form a water cone. Water coning causing a deficiency in well pr...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64372 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |