PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
Water coning is a usual phenomenon occurred in a vertical production well especially in the reservoir that having aquifer underneath. This phenomenon caused by water from the water bearing zone flowing upward to the perforation hole and form a water cone. Water coning causing a deficiency in well pr...
Saved in:
Main Author: | Fadhian Aqthori, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64372 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Evaluation of downhole water sink in bottom water drive gas reservoir
by: Pawich Sripongwarakul
Published: (2013) -
PERSAMAAN USULAN UNTUK MENGHITUNG WAKTU TEMBUS AIR PADA SUMUR HORIZONTAL DENGAN BOTTOM WATER DRIVE MECHANISM
by: Fuzail, Muhammad -
STUDY OF DOWNHOLE WATER SINK PERFORMANCE (DWS) IN WEAK WATER DRIVE RESERVOIR: PARAMETER AFFECTING DWS OPERATION
by: Andrew Natan, Jason -
DESAIN RATE PRODUKSI OPTIMUM SUMUR DOWNHOLE WATER SINK UNTUK RESERVOIR DENGAN LINGKUNGAN PENGENDAPAN DELTA MENGGUNAKAN ALGORITMA GENETIKA
by: Neldi, Yomi -
Production Rate Optimization of Downhole Water Sink Technology Using Differential Evolution Method
by: Prayoga, Budi