PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER

Water coning is a usual phenomenon occurred in a vertical production well especially in the reservoir that having aquifer underneath. This phenomenon caused by water from the water bearing zone flowing upward to the perforation hole and form a water cone. Water coning causing a deficiency in well pr...

Full description

Saved in:
Bibliographic Details
Main Author: Fadhian Aqthori, Muhammad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/64372
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64372
spelling id-itb.:643722022-05-18T16:01:20ZPERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER Fadhian Aqthori, Muhammad Pertambangan dan operasi berkaitan Indonesia Final Project downhole water sink, water coning, optimum water production rate, naturally fractured reservoir. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64372 Water coning is a usual phenomenon occurred in a vertical production well especially in the reservoir that having aquifer underneath. This phenomenon caused by water from the water bearing zone flowing upward to the perforation hole and form a water cone. Water coning causing a deficiency in well productivity because water will be produced and usually, the water production rate is higher than the economical limit. Downhole water sink (DWS) completion is proved to be able preventing water coning. DWS completion perforate and produce water from aquifer, thus creating a counterpoint drawdown in the aquifer and keeps the water oil contact (WOC) more stable. Previous study shows that there is an optimum water production rate for a given oil production rate in order to obtaining the biggest recovery factor. Using a numerical simulation for sensitivity analysis, objective of this study is to find a correlation between the optimum water production rate and several naturally fractured reservoir parameters. This study also evaluates effectivity and performance of DWS completion in naturally fractured reservoir based on the recovery factor. The result of this study is a correlation to predict the optimum water production rate for a given oil production rate in certain reservoir condition for naturally fractured reservoir with bottom aquifer. Then the performance evaluation of a DWS sets in oil production rate - optimum water production rate pair is also attached in this paper. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
Fadhian Aqthori, Muhammad
PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
description Water coning is a usual phenomenon occurred in a vertical production well especially in the reservoir that having aquifer underneath. This phenomenon caused by water from the water bearing zone flowing upward to the perforation hole and form a water cone. Water coning causing a deficiency in well productivity because water will be produced and usually, the water production rate is higher than the economical limit. Downhole water sink (DWS) completion is proved to be able preventing water coning. DWS completion perforate and produce water from aquifer, thus creating a counterpoint drawdown in the aquifer and keeps the water oil contact (WOC) more stable. Previous study shows that there is an optimum water production rate for a given oil production rate in order to obtaining the biggest recovery factor. Using a numerical simulation for sensitivity analysis, objective of this study is to find a correlation between the optimum water production rate and several naturally fractured reservoir parameters. This study also evaluates effectivity and performance of DWS completion in naturally fractured reservoir based on the recovery factor. The result of this study is a correlation to predict the optimum water production rate for a given oil production rate in certain reservoir condition for naturally fractured reservoir with bottom aquifer. Then the performance evaluation of a DWS sets in oil production rate - optimum water production rate pair is also attached in this paper.
format Final Project
author Fadhian Aqthori, Muhammad
author_facet Fadhian Aqthori, Muhammad
author_sort Fadhian Aqthori, Muhammad
title PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
title_short PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
title_full PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
title_fullStr PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
title_full_unstemmed PERSAMAAN USULAN UNTUK MENGHITUNG LAJU PRODUKSI AIR OPTIMUM KOMPLESI DOWNHOLE WATER SINK PADA RESERVOIR REKAH ALAM DENGAN WEAK BOTTOM AQUIFER
title_sort persamaan usulan untuk menghitung laju produksi air optimum komplesi downhole water sink pada reservoir rekah alam dengan weak bottom aquifer
url https://digilib.itb.ac.id/gdl/view/64372
_version_ 1822932420670783488