The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System

The widespreaduse of natural gas in Indonesia is supported by natural gasnetworks that are in the distribution of natural gas. In the natural gas distribution process,performance monitoring must be guaranteed on natural gas distribution pipelines so thatthe pipelinedoes not failure or th...

Full description

Saved in:
Bibliographic Details
Main Author: Noer Afdlila 13114101, Firdlan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24876
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:24876
spelling id-itb.:248762018-09-21T15:29:34Z&#65279;The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System Noer Afdlila 13114101, &#65279;Firdlan Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/24876 &#65279;The widespreaduse of natural gas in Indonesia is supported by natural gasnetworks that are in the distribution of natural gas. In the natural gas distribution process,performance monitoring must be guaranteed on natural gas distribution pipelines so thatthe pipelinedoes not failure or the consequences of failure can be reduced.Reliability-Centered Maintenance (RCM) is a method to determine the rightmaintenance activities for each equipment. RCM is based on seven basic questions andRCM decision diagrams, to determine the maintenance tasks that must be performed.Offshore and Onshore Reliability Data (OREDA) is an organization of several oil and gascompanies that provides reliability data from equipment used in oil and gas exploration.The method used by OREDA assumes that the average failure rate is constant which resultsin the distribution of data used in the exponential distribution.Proposed preventive task intervals must be applied to 481 vital components withdetails of 655 on-condition tasks and 454 recoverytasks as well as disposal tasks at 22.Analysis with the OREDA method produces on-condition task recommendations with 6-12 months intervals of 221 modes (30, 82%), 1-3 year intervals are 205 (28.59%); 3-5years interval is 4 modes (0.56%), and the interval over 5 years is 287 modes (40.03%).As for recovery tasks with 6-12 months intervals of 65 modes (14.01%), 1-3 year intervalsare 61 modes (13.15%); 3-5 year intervals are 300 modes (64.66%), and intervals above 5years are 38 modes (8.19%). As for the disposal task with an interval of 1.82 years 21modes (91%) and 2.98 years interval 2 (9%). <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description &#65279;The widespreaduse of natural gas in Indonesia is supported by natural gasnetworks that are in the distribution of natural gas. In the natural gas distribution process,performance monitoring must be guaranteed on natural gas distribution pipelines so thatthe pipelinedoes not failure or the consequences of failure can be reduced.Reliability-Centered Maintenance (RCM) is a method to determine the rightmaintenance activities for each equipment. RCM is based on seven basic questions andRCM decision diagrams, to determine the maintenance tasks that must be performed.Offshore and Onshore Reliability Data (OREDA) is an organization of several oil and gascompanies that provides reliability data from equipment used in oil and gas exploration.The method used by OREDA assumes that the average failure rate is constant which resultsin the distribution of data used in the exponential distribution.Proposed preventive task intervals must be applied to 481 vital components withdetails of 655 on-condition tasks and 454 recoverytasks as well as disposal tasks at 22.Analysis with the OREDA method produces on-condition task recommendations with 6-12 months intervals of 221 modes (30, 82%), 1-3 year intervals are 205 (28.59%); 3-5years interval is 4 modes (0.56%), and the interval over 5 years is 287 modes (40.03%).As for recovery tasks with 6-12 months intervals of 65 modes (14.01%), 1-3 year intervalsare 61 modes (13.15%); 3-5 year intervals are 300 modes (64.66%), and intervals above 5years are 38 modes (8.19%). As for the disposal task with an interval of 1.82 years 21modes (91%) and 2.98 years interval 2 (9%). <br />
format Final Project
author Noer Afdlila 13114101, &#65279;Firdlan
spellingShingle Noer Afdlila 13114101, &#65279;Firdlan
&#65279;The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System
author_facet Noer Afdlila 13114101, &#65279;Firdlan
author_sort Noer Afdlila 13114101, &#65279;Firdlan
title &#65279;The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System
title_short &#65279;The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System
title_full &#65279;The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System
title_fullStr &#65279;The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System
title_full_unstemmed &#65279;The Determination ofInitial Interval ofMaintenance Tasks Based on Reliability-Centered Maintenance Analysis on Equipments of Gas Distribution System
title_sort &#65279;the determination ofinitial interval ofmaintenance tasks based on reliability-centered maintenance analysis on equipments of gas distribution system
url https://digilib.itb.ac.id/gdl/view/24876
_version_ 1822921370553548800