VENTILATION ANALYSIS OF XYZ TUNNEL CONSTRUCTION AT CENTRAL JAVA PROVINCE
Based on the Strategic Plan of the Ministry of Transportation in 2015-2019, the development of infrastructure, namely the railway becomes one of the priorities that will be conducted in 2015-2019. One of the railway lines to be built is the XYZ tunnel railway in Central Java Province. This tunneling...
Saved in:
Main Author: | AZIZ (NIM : 12114047), ABDUL |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24889 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FINANCIAL FEASIBILITY STUDY OF BROILER FARM CONSTRUCTION OF PT.XYZ IN CENTRAL JAVA
by: Suro Amijoyo, Guritno -
ALTERNATIVE DESIGN OF PIDEKSO DAM DIVERSION TUNNEL, WONOGIRI REGENCY, CENTRAL JAVA PROVINCE
by: Iqbal Huseiny, Moh. -
PERFORMANCE ANALYSIS OF UPPER PART TUNNELING CYCLE OF THE XYZ TUNNEL
by: INDRA SUBROTO (NIM : 12114006), ANDHIKA -
BACK ANALYSIS OF LOWWAL SLOPE FAILURE PT XYZ, CENTRAL KALIMANTAN PROVINCE
by: Farhan Rizqia, Muhammad -
Tunnel ventilation system
by: Chan, Paul Sylvester, et al.
Published: (2007)