Improvement of Headrace Tunnel Excavation Productivity at Jatigede Hydro Electric Power Plant Project

In most part of Indonesia, demand for electrical energy has rapidly been growing since the last two decades. To catch up this increasing demand, Government of Indonesia plans to build a number of electric power plants. The program was divided into two phases or Fast Track Program (FTP), 10,000 MW Pr...

Full description

Saved in:
Bibliographic Details
Main Author: Nindyo / 29116419, Ainanto
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25222
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia