Improvement of Headrace Tunnel Excavation Productivity at Jatigede Hydro Electric Power Plant Project
In most part of Indonesia, demand for electrical energy has rapidly been growing since the last two decades. To catch up this increasing demand, Government of Indonesia plans to build a number of electric power plants. The program was divided into two phases or Fast Track Program (FTP), 10,000 MW Pr...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25222 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |