Improvement of Headrace Tunnel Excavation Productivity at Jatigede Hydro Electric Power Plant Project
In most part of Indonesia, demand for electrical energy has rapidly been growing since the last two decades. To catch up this increasing demand, Government of Indonesia plans to build a number of electric power plants. The program was divided into two phases or Fast Track Program (FTP), 10,000 MW Pr...
Saved in:
Main Author: | Nindyo / 29116419, Ainanto |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25222 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DAM, INTAKE, SANDTRAP & HEADRACE OF MICRO HYDRO POWER PLANT DESIGN IN WAY RUHU RIVER AMBON CITY
by: ALANIRI (NIM : 15813001), YUSANUARI -
DESIGN OF INTAKE, SANDTRAP, AND HEADRACE ON CIROMPANG MICRO HYDRO POWER PLANT AT CIHIKEU VILLAGE, BUNGBULANG DISTRICTS, GARUT REGENCY, WEST JAVA
by: NAFISAH RAHMANI IRAWAN (NIM : 15813005), AMALIA -
IMPROVEMENT OF PROJECT MANAGEMENT SYSTEM IN CONSTRUCTION DEVELOPMENT: A CASE STUDY OF THE UPPER CISOKAN HYDRO ELECTRIC POWER PLANT
by: Harianto Sinaga, Chandra -
STUDY OF RELIABILITY IMPROVEMENT BAKARU HYDRO ELECTRIC POWER PLANT PT PLN (PERSERO)
by: Ardhiyansah, Aris -
STUDY OF RELIABILITY IMPROVEMENT BAKARU HYDRO ELECTRIC POWER PLANT PT PLN (PERSERO)
by: Ardhiyansah, Aris