Displacement of MRT tunnels due to an adjacent excavation

A large excavation of approximately 140m wide and 200m long was required at the proposed Tan Tock Seng Hospital site in Singapore for the construction of a 15m deep basement. The excavation is close to 2 nos. of Mass Rapid Transit (MRT) tunnels of 6m diameter. The reduced levels (RL) of the tunnels...

Full description

Saved in:
Bibliographic Details
Main Author: Chan, Chee Weng.
Other Authors: Low, Bak Kong
Format: Theses and Dissertations
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19445
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English