Displacement of MRT tunnels due to an adjacent excavation
A large excavation of approximately 140m wide and 200m long was required at the proposed Tan Tock Seng Hospital site in Singapore for the construction of a 15m deep basement. The excavation is close to 2 nos. of Mass Rapid Transit (MRT) tunnels of 6m diameter. The reduced levels (RL) of the tunnels...
Saved in:
Main Author: | Chan, Chee Weng. |
---|---|
Other Authors: | Low, Bak Kong |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19445 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Effects of Tunnel Excavation on Adjacent Buildings in Ho Chi Minh Urban Area
by: T.H., Tin, et al.
Published: (2010) -
Effects of Tunnel Excavation on Adjacent Buildings in Ho Chi Minh Urban Area
by: T.H., Tin, et al.
Published: (2010) -
Effect of excavation on performance of adjacent buildings
by: Halim, Darwid
Published: (2008) -
Ground behaviour due to tunnelling at MRT NEL C-705 project
by: Dave Jugo Prakoso Witjaksono
Published: (2008) -
Deep excavation at the millenia MRT station
by: Wang, Yong Jie.
Published: (2008)