ROADHEADER PERFORMANCE ANALYSIS FOR NANJUNG WATER TUNNEL EXCAVATION
The Nanjung Tunnel is a parallel tunnel construction project for waterways, each of which has a length of 230 meters. The making of The Nanjung Water Tunnel uses the New Austrian Tunnelling Method (NATM) method with roadheader as their main excavation tool. The roadheader moves transversely, breakin...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/41854 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |