ROADHEADER PERFORMANCE ANALYSIS FOR NANJUNG WATER TUNNEL EXCAVATION
The Nanjung Tunnel is a parallel tunnel construction project for waterways, each of which has a length of 230 meters. The making of The Nanjung Water Tunnel uses the New Austrian Tunnelling Method (NATM) method with roadheader as their main excavation tool. The roadheader moves transversely, breakin...
Saved in:
Main Author: | Wahyu Hidayat, Dhany |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/41854 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF ROADHEADER PERFORMANCE FOR TUNNEL RAILWAY CONSTRUCTION IN PURWOKERTO-KROYA LINE IN NOTOG
by: WISHNU PRADANA (NIM : 12113086), YOGA -
RELIABILITY ANALYSIS OF NANJUNG TUNNEL
by: Fajar Somahartadi, Tiko -
ANALYSIS OF ASPECTS THAT COULD AFFECT THE AMOUNT OF CONVERGENCE AND TUNNEL STABILITY IN TUNNEL OF WATER NANJUNG
by: Rizky Fauzan, Dennas -
BLASTING EFFECT ANALYSIS ON THE NANJUNG TUNNEL STABILITY
by: Jasipto, Alio -
ANALYSIS OF THE STABILITY OF THE T1 SECTION OF THE OUTLET WATER TUNNEL BASED ON CONVERGENT MEASUREMENTS OF THE NANJUNG WATER TUNNEL
by: Llang Mayo, Keithcar