BLASTING DESIGN OF NANJUNG WATER TUNNEL USING SWEDISH METHOD
the capacity of Citarum river from 570 m3/s to 643 m3/s and will accelerate the river flow at Curug Jompong to Nanjung. Tunnel construction is using conventional excavation method with excavator on weak rock mass and using drill-blast method on hard rock mass. Blasting design of Nanjung water tunne...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40319 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |