ANALYSIS OF THE EXCAVATION AND STABILITY METHOD AT THE JOGJA-BAWEN TWIN TOLL ROAD TUNNELS

The Twin Toll Road Tunnels of the Jogja-Bawen constructed in Losari village, Grabag, Magelang, Central Java on the Ambarawa-Temanggung section with 550-560 meters length. The construction of the tunnel using NATM methods, horse shoe cross section with dimensions of 19.2 m x 12.8 m and free space...

Full description

Saved in:
Bibliographic Details
Main Author: Adhitya Y.L.A., Boyke
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/61806
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia