ANALYSIS OF THE EXCAVATION AND STABILITY METHOD AT THE JOGJA-BAWEN TWIN TOLL ROAD TUNNELS
The Twin Toll Road Tunnels of the Jogja-Bawen constructed in Losari village, Grabag, Magelang, Central Java on the Ambarawa-Temanggung section with 550-560 meters length. The construction of the tunnel using NATM methods, horse shoe cross section with dimensions of 19.2 m x 12.8 m and free space...
Saved in:
Main Author: | Adhitya Y.L.A., Boyke |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61806 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SELECTION OF THE OPTIMUM STAGED EXCAVATION METHOD FOR THE YOGYAKARTA-BAWEN TWIN TOLL ROAD TUNNELS
by: Timothy Motoh, Rexy -
STABILITY ANALYSIS OF TUNNEL PORTALS APPLYING THE ARTIFICIAL GROUND OVERBURDEN ON THE TWIN TUNNEL OF THE YOGYAKARTA-BAWEN TOLL ROAD
by: Rinaldy -
STABILITY OF TWIN TUNNEL EXCAVATION METHOD OF YOGYAKARTA-BAWEN TOLL ROAD AT STA 20+435 WITH SIDE DRIFT AND CENTRAL DIAPHRAGM METHODS BASED ON 2D NUMERICAL MODELING
by: Agung Prasetyo, Dimas -
Design Review of Semarang-Bawen Toll Road
by: ADIB ASH SHIDDIQI (NIM 15004144), ALFA -
SLOPE STABILITY ANALYSIS OF PORTAL ZONE OF JOGJA-BAWEN TUNNEL WITH SOIL NAILING, GABION ANCHOR, AND RETAINING WALL REINFORCEMENT
by: Lumbantobing, Wasti