STABILITY ANALYSIS OF TUNNEL B ON THE YOGYAKARTA-BAWEN TOLL ROAD SECTION AT STA 20+435 UTILIZING THE CENTRAL DIAPHRAGM METHOD USING 3D NUMERICAL MODELING.
The Yogyakarta-Bawen Toll Road Project includes the Twin Tunnels, which are situated in Section 5 of the Temanggung-Ambarawa road (STA 20+273 to STA 20+679). These tunnels will be built via Bukit Banaran in the Kragan, Losari Village, Magelang Regency, Central Java. There are two twin tunnels tha...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76820 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |