DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA
<p align="justify">Rendani Airport construction needs embankment to reach the required elevation +3.0 m. Other than that, the working load of the runway, taxiway, and apron is 10 kN/m2 and 7 kN/m2 pavement load for runway and taxiway, while for apron is 15 kN/m2. This construction wi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25303 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |