DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA
<p align="justify">Rendani Airport construction needs embankment to reach the required elevation +3.0 m. Other than that, the working load of the runway, taxiway, and apron is 10 kN/m2 and 7 kN/m2 pavement load for runway and taxiway, while for apron is 15 kN/m2. This construction wi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25303 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:25303 |
---|---|
spelling |
id-itb.:253032018-03-20T09:18:58ZDESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA KELVIN GUNAWAN - NIM : 15014046 , ALBERTUS Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/25303 <p align="justify">Rendani Airport construction needs embankment to reach the required elevation +3.0 m. Other than that, the working load of the runway, taxiway, and apron is 10 kN/m2 and 7 kN/m2 pavement load for runway and taxiway, while for apron is 15 kN/m2. This construction will be built on a soil with very thick layers of clay. Clay soil tend to have a big consolidation degree coefficient. Therefore, improvement of soil is needed to fasten the time of consolidation. Analysis result shows that the most optimal method to mitigte the problem on this construction is prefabricated vertical drain, and preloading. <br /> <br /> The consolidation with soil in it’s natural state will be done by 64 years. So, the improvement of soil is necessery in this case. The improvement used here is preloading and prefabricated vertical drain. With the use of preloading, the load impacted on the soil will be bigger, therefore the consolidation rate needed can be done faster. This improvement is supported by the use of PVD that shorten the drainge way so the pore pressure will be dissipated faster. <br /> <br /> This designing process will use manual calculation and then compared to Plaxis 2D software with Mohr-Column type as the model. <br /> <br /> After the embankment design is completed, proceed with the pile foundation planning along with the supporting elements, such as pile cap, pedestal, pile head treatment, and tie beam. <br /> <br /> The designing process of foundation and its supporting elements will use manual calculation and software, such as ENSOFT and PCACOL. <p align="justify"> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
<p align="justify">Rendani Airport construction needs embankment to reach the required elevation +3.0 m. Other than that, the working load of the runway, taxiway, and apron is 10 kN/m2 and 7 kN/m2 pavement load for runway and taxiway, while for apron is 15 kN/m2. This construction will be built on a soil with very thick layers of clay. Clay soil tend to have a big consolidation degree coefficient. Therefore, improvement of soil is needed to fasten the time of consolidation. Analysis result shows that the most optimal method to mitigte the problem on this construction is prefabricated vertical drain, and preloading. <br />
<br />
The consolidation with soil in it’s natural state will be done by 64 years. So, the improvement of soil is necessery in this case. The improvement used here is preloading and prefabricated vertical drain. With the use of preloading, the load impacted on the soil will be bigger, therefore the consolidation rate needed can be done faster. This improvement is supported by the use of PVD that shorten the drainge way so the pore pressure will be dissipated faster. <br />
<br />
This designing process will use manual calculation and then compared to Plaxis 2D software with Mohr-Column type as the model. <br />
<br />
After the embankment design is completed, proceed with the pile foundation planning along with the supporting elements, such as pile cap, pedestal, pile head treatment, and tie beam. <br />
<br />
The designing process of foundation and its supporting elements will use manual calculation and software, such as ENSOFT and PCACOL. <p align="justify"> |
format |
Final Project |
author |
KELVIN GUNAWAN - NIM : 15014046 , ALBERTUS |
spellingShingle |
KELVIN GUNAWAN - NIM : 15014046 , ALBERTUS DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA |
author_facet |
KELVIN GUNAWAN - NIM : 15014046 , ALBERTUS |
author_sort |
KELVIN GUNAWAN - NIM : 15014046 , ALBERTUS |
title |
DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA |
title_short |
DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA |
title_full |
DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA |
title_fullStr |
DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA |
title_full_unstemmed |
DESIGN OF TERMINAL FOUNDATION AND EMBANKMENT ON RENDANI AIRPORT AREA |
title_sort |
design of terminal foundation and embankment on rendani airport area |
url |
https://digilib.itb.ac.id/gdl/view/25303 |
_version_ |
1821910386826280960 |