#TITLE_ALTERNATIVE#

The purpose of this paper is to study the Life Cycle Management (LCM) on the operation of 400 MW Coal Fired Power Plant (CFPP). LCM is an effort by an asset manager to improve the condition of an asset in the middle life of CFPP in order to achieve the optimum value of an asset so that it is expecte...

Full description

Saved in:
Bibliographic Details
Main Author: YUSNI (NIM: 23215007), ALI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25388
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia