#TITLE_ALTERNATIVE#
The purpose of this paper is to study the Life Cycle Management (LCM) on the operation of 400 MW Coal Fired Power Plant (CFPP). LCM is an effort by an asset manager to improve the condition of an asset in the middle life of CFPP in order to achieve the optimum value of an asset so that it is expecte...
Saved in:
Main Author: | YUSNI (NIM: 23215007), ALI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25388 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: YUSNI (NIM : 13603030); Pembimbing: Ir. Rais Zain, M.Eng, ALI -
#TITLE_ALTERNATIVE#
by: ALI (NIM : 15201032), RULYAN -
#TITLE_ALTERNATIVE#
by: GANI (NIM 13204183), ALI -
#TITLE_ALTERNATIVE#
by: LUKMAN (NIM 12007063), ALI -
#TITLE_ALTERNATIVE#
by: Akbar (NIM 13503095), Ali