DUMP TRUCK SELECTING BETWEEN, KOMATSU HM400-1 WITH CAT 740C BASED ON PRODUCTIVITY AND TOTAL COST IN PIT A PT XYZ
In the current mining industry, fluctuations in the prices of mining commodities often occur, either the increase or decrease of the selling price. Increased selling prices led to increased production activity, which was accompanied by an increase in overall operating costs. While the decline in sel...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25406 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |