STUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA)

<p align="justify">The construction industry is currently still trying to deal with problems caused by waste in the implementation of the construction process. Today the construction industry has adopted and learned from the manufacturing industry about an innovative and fundamental...

Full description

Saved in:
Bibliographic Details
Main Author: ARIESTY - NIM : 25016011, ANITA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25637
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:25637
spelling id-itb.:256372018-09-27T13:13:11ZSTUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA) ARIESTY - NIM : 25016011, ANITA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/25637 <p align="justify">The construction industry is currently still trying to deal with problems caused by waste in the implementation of the construction process. Today the construction industry has adopted and learned from the manufacturing industry about an innovative and fundamental system, namely lean production through the application of lean principles, hereinafter known as lean construction. <br /> <br /> <br /> The successful implementation of the last planner system method as part of lean construction in other countries, encourages its implementation in Indonesia. Therefore, research on the study of the potential application of the principles of the last planner system that is reviewed consists of the principle of one piece flow, pull system, heijunka and jidoka on building construction projects in an effort to reduce waste and increase value with the aim of knowing, assess the extent to which the potential application of the principles of the last planner system in the practice of construction project production through the development of a potential assessment system last planner system, which consists of small, medium and large potential assessment criteria. This is done through interviews, document reviews and direct field observations of building construction projects. <br /> <br /> <br /> From the results of the study it was found that the potential for the implementation of the last planner system method is medium value to be applied to the construction project practice because there are still obstacles and challenges in its application to the construction project production practices. To be able to apply these principles requires more detailed planning, harmonious and intense coordination and collaboration from all parties to be involved in the planning and implementation process.<p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">The construction industry is currently still trying to deal with problems caused by waste in the implementation of the construction process. Today the construction industry has adopted and learned from the manufacturing industry about an innovative and fundamental system, namely lean production through the application of lean principles, hereinafter known as lean construction. <br /> <br /> <br /> The successful implementation of the last planner system method as part of lean construction in other countries, encourages its implementation in Indonesia. Therefore, research on the study of the potential application of the principles of the last planner system that is reviewed consists of the principle of one piece flow, pull system, heijunka and jidoka on building construction projects in an effort to reduce waste and increase value with the aim of knowing, assess the extent to which the potential application of the principles of the last planner system in the practice of construction project production through the development of a potential assessment system last planner system, which consists of small, medium and large potential assessment criteria. This is done through interviews, document reviews and direct field observations of building construction projects. <br /> <br /> <br /> From the results of the study it was found that the potential for the implementation of the last planner system method is medium value to be applied to the construction project practice because there are still obstacles and challenges in its application to the construction project production practices. To be able to apply these principles requires more detailed planning, harmonious and intense coordination and collaboration from all parties to be involved in the planning and implementation process.<p align="justify"> <br />
format Theses
author ARIESTY - NIM : 25016011, ANITA
spellingShingle ARIESTY - NIM : 25016011, ANITA
STUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA)
author_facet ARIESTY - NIM : 25016011, ANITA
author_sort ARIESTY - NIM : 25016011, ANITA
title STUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA)
title_short STUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA)
title_full STUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA)
title_fullStr STUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA)
title_full_unstemmed STUDY THE POTENTIAL OF APPLYING THE LAST PLANNER SYSTEM PRINCIPLE TO BUILDING CONSTRUCTION PROJECT WORK (CASE STUDY : 2 BUILDING PROJECTS IN WEST JAVA)
title_sort study the potential of applying the last planner system principle to building construction project work (case study : 2 building projects in west java)
url https://digilib.itb.ac.id/gdl/view/25637
_version_ 1822921623846518784