IMPLEMENTATION OF LAST PLANNER SYSTEM TO IMPROVE PROJECT PRODUCTIVTY (CASE STUDY: PT. INOMATA KONSULTAMA)

PT. Inomata Konsultama is a company that does work every year from the Geospatial Information Agency (BIG) through tender mechanism. In the last 2 years, the company face the losses caused by the delay. At present, the company is collaborating on one of BIG's project called the Hydrographic...

Full description

Saved in:
Bibliographic Details
Main Author: Surianta Sembiring, Hendra
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/49373
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia