DEVELOPMENT OF WTP INFRASTRUCTURE FOR NEW GUNUNG PUTRI DRINKING WATER SUPPLY SYSTEM YEAR 2030 IN PDAM TIRTA KAHURIPAN BOGOR REGENCY
: A sufficient water treatment plant (WTP) is required to fulfil the objectivity of drinking water supply service functions which are, quality, quantity, continuity, and competitive water price. Gunung Putri WTP is one of the Water Treatment Plants owned by PDAM Tirta Kahuripan Bogor Regency, which...
Saved in:
Main Author: | FITRI LOUISIANA (NIM: 15314096), ASRI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25864 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Development of Water Treatment Plant Infrastructure - New Gunung Putri Drinking Water Supply System Year 2030 PDAM Tirta Kahuripan Bogor Regency
by: SARI OKTAVIANI NIM: 15314078, DWI -
UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT
by: WIJAYA (NIM: 15314076), TYA -
UPRATING COAGULATION, FLOCCULATION, AND SEDIMENTATION UNIT CIBINONG I WATER TREATMENT PLANT (WTP) PDAM TIRTA KAHURIPAN BOGOR DISTRICT
by: WILBERT DEE GINTING NIM : 15314013, YOSIA -
UPRATING COAGULATION, FLOCCULATION, AND SEDIMENTATION UNIT DEKENG II WTP PDAM TIRTA PAKUAN BOGOR
by: ELI BENJAMIN (NIM : 15313068 ), FAJAR -
UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNIT DEKENG II WTP PDAM TIRTA PAKUAN BOGOR
by: RIRAEL MAHARDHIKA (NIM: 15313021), EPHAPRAS