#TITLE_ALTERNATIVE#
An economic costs model for CO2-EOR project constructed in this study can be used to simply calculate investments and operating costs required for a CO2-EOR project. In this study, the costs model is validated with a CO2 pilot injection project pre-feasibility study in South Sumatera. Aside from the...
Saved in:
Main Author: | AHMAD NAUFAL (NIM : 12214083), AULIA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25914 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: NAUFAL AFIF - NIM: 18014040 , AHMAD -
#TITLE_ALTERNATIVE#
by: NAUFAL (NIM : 12012073), MUHAMMAD -
#TITLE_ALTERNATIVE#
by: AULIA JUSTISIANANTO (NIM : 12214098), AHMAD -
#TITLE_ALTERNATIVE#
by: LUTHFAN NAUFAL (NIM : 15110025), MUHAMMAD -
#TITLE_ALTERNATIVE#
by: NAUFAL LINTANGPRADIPTO (NIM : 13309023), MUHAMMAD