#TITLE_ALTERNATIVE#
An economic costs model for CO2-EOR project constructed in this study can be used to simply calculate investments and operating costs required for a CO2-EOR project. In this study, the costs model is validated with a CO2 pilot injection project pre-feasibility study in South Sumatera. Aside from the...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25914 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!