X Field is operated by VICO Indonesia in the Sanga-Sanga Production Sharing Contract. It is located in the <br /> <br /> Mahakam Delta. It has been producing oil and primarily gas since 1977. Due to its complex fluvial deltaic <br /> <br /> deposition, X Field has over 500 re...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25931 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | X Field is operated by VICO Indonesia in the Sanga-Sanga Production Sharing Contract. It is located in the <br />
<br />
Mahakam Delta. It has been producing oil and primarily gas since 1977. Due to its complex fluvial deltaic <br />
<br />
deposition, X Field has over 500 reservoirs. This big number of reservoirs promotes the implementation of <br />
<br />
monobore/dual-bore completion in the recent years. X Field currently has hundreds of wells both with <br />
<br />
conventional completion and monobore/dual-bore completion. Since X Field is a major gas producer, the most <br />
<br />
widely used artificial lift method is gas lift. Permanent Coiled Tubing Gas Lift (PCTGL), which is a <br />
<br />
breakthrough in VICO Indonesia since 2010, where the gas is injected through the coiled tubing and the oil is <br />
<br />
produced through the annulus between the tubing and the coiled tubing, has been applied in monobore/dualbore <br />
<br />
completed wells because this type of completion cannot accommodate the gas lift mandrels. Conventional <br />
<br />
Gas Lift (CGL) that uses gas lift mandrels and unloader valves has also been applied to older wells with <br />
<br />
conventional completion. Both of these gas lift methods have their own advantages and disadvantages such as: <br />
<br />
CGL installation is more expensive than PCTGL, PCTGL is limited to a certain depth of injection whereas CGL <br />
<br />
is not, and the flow area in the tubing in PCTGL installed well is smaller than CGL. A thorough evaluation of <br />
<br />
oil well performance using PCTGL and CGL has not been conducted in X Field. This evaluation is required to <br />
<br />
provide suggestion for VICO Indonesia and the next operator as to which method will give higher recovery. <br />
<br />
This study shows that the best gas lift method to apply in monobore/dual-bore wells is PCTGL with coiled <br />
<br />
tubing diameter of 1.5” and in conventional completed wells is CGL. |
---|