THE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang)

TBBM Bandung Group Padalarang have been certified by OHSAS 18001:2007 Health and Safety Management System and has implemented OSH programs to minimize risks. However, there are still work accident in recent years. This indicates that the implementation of the programs still need to be improved. An e...

Full description

Saved in:
Bibliographic Details
Main Author: AJI KRISNARA NIM 13413065, AWAL
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25953
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:25953
spelling id-itb.:259532018-03-19T09:27:22ZTHE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang) AJI KRISNARA NIM 13413065, AWAL Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/25953 TBBM Bandung Group Padalarang have been certified by OHSAS 18001:2007 Health and Safety Management System and has implemented OSH programs to minimize risks. However, there are still work accident in recent years. This indicates that the implementation of the programs still need to be improved. An empirical example is the existing rules of use full body harness for work at an altitude above two meters but in the implementation there are still workers who do not follow the rules so that work accidents occur. These problems can occur due to ignorance of the parties, unawareness, inconsistent or too light implementation of sanctions, top management is taken for granted, the partner is not aware. On the other hand, there is an 8E-1M method that can solve these problems holistically and integratively. However, this method is still new and not yet detailed which requires the mechanism of its implementation. This study has a purpose to provide guidace on implementation of 8E-1M for OSH issues so that company and other parties can apply it more easily. <br /> <br /> Data was collected through discussions and interviews, field observatios, and document studies of HIRADC companies. Methodology of research conducted in this study started by inventory of cases in TBBM Padalarang, then determine cases that to be assessed based on the level of risk, then from each case is estimated causes, alternative solutions, and related experts. Next selected the best alternative solution to solve the problem. A detailed solution is then developed to ensure that the selected solution is effective. In this study, the 8E-1M operability system is described at each stage to make it easier to follow text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description TBBM Bandung Group Padalarang have been certified by OHSAS 18001:2007 Health and Safety Management System and has implemented OSH programs to minimize risks. However, there are still work accident in recent years. This indicates that the implementation of the programs still need to be improved. An empirical example is the existing rules of use full body harness for work at an altitude above two meters but in the implementation there are still workers who do not follow the rules so that work accidents occur. These problems can occur due to ignorance of the parties, unawareness, inconsistent or too light implementation of sanctions, top management is taken for granted, the partner is not aware. On the other hand, there is an 8E-1M method that can solve these problems holistically and integratively. However, this method is still new and not yet detailed which requires the mechanism of its implementation. This study has a purpose to provide guidace on implementation of 8E-1M for OSH issues so that company and other parties can apply it more easily. <br /> <br /> Data was collected through discussions and interviews, field observatios, and document studies of HIRADC companies. Methodology of research conducted in this study started by inventory of cases in TBBM Padalarang, then determine cases that to be assessed based on the level of risk, then from each case is estimated causes, alternative solutions, and related experts. Next selected the best alternative solution to solve the problem. A detailed solution is then developed to ensure that the selected solution is effective. In this study, the 8E-1M operability system is described at each stage to make it easier to follow
format Final Project
author AJI KRISNARA NIM 13413065, AWAL
spellingShingle AJI KRISNARA NIM 13413065, AWAL
THE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang)
author_facet AJI KRISNARA NIM 13413065, AWAL
author_sort AJI KRISNARA NIM 13413065, AWAL
title THE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang)
title_short THE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang)
title_full THE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang)
title_fullStr THE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang)
title_full_unstemmed THE DEVELOPMENT OF IMPLEMENTATION MECHANISM AND GUIDANCE FOR 8E-1M OPERABILITY SYSTEM TO IMPROVE THE EFFECTIVENESS OF OSH PROGRAMS (Implementation Case at TBBM Padalarang)
title_sort development of implementation mechanism and guidance for 8e-1m operability system to improve the effectiveness of osh programs (implementation case at tbbm padalarang)
url https://digilib.itb.ac.id/gdl/view/25953
_version_ 1822921732643618816