NETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1
Transit-Oriented Development (TOD) is considered to be one of the tools to solving urban <br /> <br /> transport problems, where TOD is a mixed use concept and integrated with public transport <br /> <br /> network. The concept of TOD began to emerge in Indonesia in line with...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25979 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:25979 |
---|---|
spelling |
id-itb.:259792018-03-02T15:33:52ZNETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1 PRIMA YESUARI (NIM : 24216005), AYU Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/25979 Transit-Oriented Development (TOD) is considered to be one of the tools to solving urban <br /> <br /> transport problems, where TOD is a mixed use concept and integrated with public transport <br /> <br /> network. The concept of TOD began to emerge in Indonesia in line with the increasing number <br /> <br /> of urban mass transit plans, such as the MRT and LRT, or regional mass public transport <br /> <br /> systems, such as the high speed rail. <br /> <br /> Many cities in the world are already implementing the concept of TOD, however not always <br /> <br /> are TOD’s goals fulfilled. During planning and implementation of TOD, emerging governance <br /> <br /> issues may pop up due to unclear division of authority as well as tensions across sectors and <br /> <br /> various actors involved with different perceptions, objectives, resources, and strategies. In the <br /> <br /> Indonesian context, the legal base of planning in implementing TOD is not complete yet. <br /> <br /> Theoretically, network governance can occur both hierarchically and informally to make <br /> <br /> effective development and policy implementation. <br /> <br /> With this background, this study aims to analyze the network governance between actors within <br /> <br /> the strategic planning framework to implement TOD in Indonesia. The case studies are the <br /> <br /> development of TOD along the MRT Jakarta Phase 1 corridor, especially the Dukuh Atas TOD. <br /> <br /> The study applies qualitative approach based on in-depth interviews with various actors <br /> <br /> directly involved in the implementation of TOD. The analytic methods include content analysis <br /> <br /> and network governance analysis. Initially, policy identification was undertaken in 4 (four) <br /> <br /> strategic planning frameworks to implement TOD, and then analyzed network governance <br /> <br /> among actors within each strategic planning framework. <br /> <br /> From the research results can be concluded that the network governance between actors in <br /> <br /> implementing this TOD has started to form, but still low. Generally the actors already have an <br /> <br /> awareness of the existence of multi actors involved with plurakity of perceptions, objectives, <br /> <br /> and authority, but coordination between actors is still lacking and there is no agreement in <br /> <br /> achieving common goals because there is no mechanism and guidance of cooperation, besides <br /> <br /> that there are also deficiencies in institutions and rules that encourage cooperation between <br /> <br /> actors. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Transit-Oriented Development (TOD) is considered to be one of the tools to solving urban <br />
<br />
transport problems, where TOD is a mixed use concept and integrated with public transport <br />
<br />
network. The concept of TOD began to emerge in Indonesia in line with the increasing number <br />
<br />
of urban mass transit plans, such as the MRT and LRT, or regional mass public transport <br />
<br />
systems, such as the high speed rail. <br />
<br />
Many cities in the world are already implementing the concept of TOD, however not always <br />
<br />
are TOD’s goals fulfilled. During planning and implementation of TOD, emerging governance <br />
<br />
issues may pop up due to unclear division of authority as well as tensions across sectors and <br />
<br />
various actors involved with different perceptions, objectives, resources, and strategies. In the <br />
<br />
Indonesian context, the legal base of planning in implementing TOD is not complete yet. <br />
<br />
Theoretically, network governance can occur both hierarchically and informally to make <br />
<br />
effective development and policy implementation. <br />
<br />
With this background, this study aims to analyze the network governance between actors within <br />
<br />
the strategic planning framework to implement TOD in Indonesia. The case studies are the <br />
<br />
development of TOD along the MRT Jakarta Phase 1 corridor, especially the Dukuh Atas TOD. <br />
<br />
The study applies qualitative approach based on in-depth interviews with various actors <br />
<br />
directly involved in the implementation of TOD. The analytic methods include content analysis <br />
<br />
and network governance analysis. Initially, policy identification was undertaken in 4 (four) <br />
<br />
strategic planning frameworks to implement TOD, and then analyzed network governance <br />
<br />
among actors within each strategic planning framework. <br />
<br />
From the research results can be concluded that the network governance between actors in <br />
<br />
implementing this TOD has started to form, but still low. Generally the actors already have an <br />
<br />
awareness of the existence of multi actors involved with plurakity of perceptions, objectives, <br />
<br />
and authority, but coordination between actors is still lacking and there is no agreement in <br />
<br />
achieving common goals because there is no mechanism and guidance of cooperation, besides <br />
<br />
that there are also deficiencies in institutions and rules that encourage cooperation between <br />
<br />
actors. |
format |
Theses |
author |
PRIMA YESUARI (NIM : 24216005), AYU |
spellingShingle |
PRIMA YESUARI (NIM : 24216005), AYU NETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1 |
author_facet |
PRIMA YESUARI (NIM : 24216005), AYU |
author_sort |
PRIMA YESUARI (NIM : 24216005), AYU |
title |
NETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1 |
title_short |
NETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1 |
title_full |
NETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1 |
title_fullStr |
NETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1 |
title_full_unstemmed |
NETWORK GOVERNANCE WITHIN THE STRATEGIC PLANNING FRAMEWORK TO IMPLEMENT TRANSIT-ORIENTED DEVELOPMENT (TOD) CASE STUDY : MRT JAKARTA PHASE 1 |
title_sort |
network governance within the strategic planning framework to implement transit-oriented development (tod) case study : mrt jakarta phase 1 |
url |
https://digilib.itb.ac.id/gdl/view/25979 |
_version_ |
1822921743169224704 |