#TITLE_ALTERNATIVE#
The well spacing problem is one that has plagued the oil industry for many years. How many well that will be drilled, and further drill for infill well; are certain thing that must be considered carefully, as it affects the value of well spacing to be used. Optimum spacing size is one factor that is...
Saved in:
Main Author: | FEBRIAN (NIM : 12208076), BAYU |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26042 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: Setiadi (NIM: 13503028), Febrian -
#TITLE_ALTERNATIVE#
by: BUDIARTO (NIM : 12308050), FEBRIAN -
#TITLE_ALTERNATIVE#
by: FEBRIAN (NIM : 13308062 ), NICO -
#TITLE_ALTERNATIVE#
by: WIJOSENO, FEBRIAN -
#TITLE_ALTERNATIVE#
by: FEBRIAN RAHMAN (NIM 10104024), ADHITYA