CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA

<p align="justify">Jakarta never stopped to construct office buildings to accommodate the interest of the economic drivers. However, Jakarta has a problem of limited land so that development should be done vertically. A mixeduse building is the latest vertical building solution. The...

Full description

Saved in:
Bibliographic Details
Main Author: NUR KOMARA - NIM : 15014085 , CATHERINE
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26211
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26211
spelling id-itb.:262112018-07-02T15:14:10ZCONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA NUR KOMARA - NIM : 15014085 , CATHERINE Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26211 <p align="justify">Jakarta never stopped to construct office buildings to accommodate the interest of the economic drivers. However, Jakarta has a problem of limited land so that development should be done vertically. A mixeduse building is the latest vertical building solution. The mixed-use building reviewed in this Final Project is Graha Gatsu Building in South Jakarta's business center with office and hotel functions. The scope of this Final Project generally involves the creation of Work Breakdown Structures, planning of construction methods, modeling using Tekla Structures 21.0, work volume calculations, determining productivity-based scheduling, and detailed project cost estimation for preparatory work, ground work, lower structure work, and upper structure work. Work volume calculations are performed using Tekla Structures 21.0 and manual calculations. The determination of duration of work is done based on two factors that are based on the heavy equipment leads and the labor resources leads. Detailed cost estimation were made using two methods: unit price using SNI and Permen PU no. 28 2016 and resource enumeration. The Graha Gatsu project is assumed to be constructed from July 1, 2018 to December 22, 2020 for a total duration of 906 days or 2,5 years. The project cost budget plan is Rp 220.992.998.900,- with a percentage of cost for the preparatory work of 2,551%, ground work 4,001%, lower structure work 22,633%, and structural work on 70,815%. <p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Jakarta never stopped to construct office buildings to accommodate the interest of the economic drivers. However, Jakarta has a problem of limited land so that development should be done vertically. A mixeduse building is the latest vertical building solution. The mixed-use building reviewed in this Final Project is Graha Gatsu Building in South Jakarta's business center with office and hotel functions. The scope of this Final Project generally involves the creation of Work Breakdown Structures, planning of construction methods, modeling using Tekla Structures 21.0, work volume calculations, determining productivity-based scheduling, and detailed project cost estimation for preparatory work, ground work, lower structure work, and upper structure work. Work volume calculations are performed using Tekla Structures 21.0 and manual calculations. The determination of duration of work is done based on two factors that are based on the heavy equipment leads and the labor resources leads. Detailed cost estimation were made using two methods: unit price using SNI and Permen PU no. 28 2016 and resource enumeration. The Graha Gatsu project is assumed to be constructed from July 1, 2018 to December 22, 2020 for a total duration of 906 days or 2,5 years. The project cost budget plan is Rp 220.992.998.900,- with a percentage of cost for the preparatory work of 2,551%, ground work 4,001%, lower structure work 22,633%, and structural work on 70,815%. <p align="justify"> <br />
format Final Project
author NUR KOMARA - NIM : 15014085 , CATHERINE
spellingShingle NUR KOMARA - NIM : 15014085 , CATHERINE
CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA
author_facet NUR KOMARA - NIM : 15014085 , CATHERINE
author_sort NUR KOMARA - NIM : 15014085 , CATHERINE
title CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA
title_short CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA
title_full CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA
title_fullStr CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA
title_full_unstemmed CONSTRUCTION MANAGEMENT ASPECTS PLANNING OF 30 STOREY HIGH RISE BUILDING IN SOUTH JAKARTA
title_sort construction management aspects planning of 30 storey high rise building in south jakarta
url https://digilib.itb.ac.id/gdl/view/26211
_version_ 1821934002837127168