Study of the Impact of Soroja Toll Road Opening on Soreang-Rancabali Road Performance
Soroja toll road was built to overcome the problem of accessibility between Bandung City and Bandung Regency that cause slow development and utilization of Bandung Regency’s resources. Therefore, the development of Soroja toll road was expected to boost Bandung Regency’s economy especially in...
Saved in:
Main Author: | JASMINE GUNARSO (NIM: 15414018), CHINTYA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26243 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TRAFFIC IMPACT ANALYSIS OF TOLL ROAD OPENING ON URBAN ROAD NETWORK (CASE STUDY : GEDEBAGE TOLL GATE KM 149 PADALANG - CILEUNYI TOLL ROAD)
by: Syawal Kamil, Ibnu -
MODELING TOLL ROAD RAMP-UP PERIOD USING AGENT-BASED SIMULATION WITH REINFORCEMENT LEARNING APPROACH(STUDY CASE: SOREANG-PASIRÂ KOJAÂ TOLLÂ ROAD)
by: Indra Dharmawan, Weka -
APPLICATION STUDY OF PERFORMANCE BASED ANNUITY SCHEME (PBAS) ON TOLL ROAD (Studi Case : Cisumdawu Toll Road)
by: HANANTO - NIM: 26914315, PRIMA -
STUDY TOLL ROAD INSURANCE WITH SHARIA SYSTEM (CASE STUDY: TOLL ROAD CIKAMPEK-PALIMANAN)
by: SETIAWAN (NIM : 26914313), KOMARA -
DEVELOPMENT OF BUSINESS IMPACT ANALYSIS (BIA) IN TOLL ROAD OPERATION (CASE STUDY: TANJUNG PRIOK ACCESS TOLL ROAD)
by: Nur Wulandari, Rias